
HVAC Contracting Company in Dubai
Air conditioning installed by the same team that commissions it, so cooling problems are fixed on site, not argued about between contractors.
What does an HVAC contractor install?
An HVAC contractor supplies and installs the equipment that cools and ventilates a building: chillers, air handling units, fan coil units, VRF and split systems, ductwork, pipework and controls. The work ends with testing, air and water balancing and commissioning.
Designs come from our HVAC consultants or yours. If the system is noisy, see HVAC acoustic services; for controls, see BMS contracting.
Most HVAC complaints trace back to installation rather than design: ductwork squeezed around an obstruction, insulation left off where nobody would look, a system switched on but never balanced. As an HVAC contracting company in Dubai we install to the approved drawings, and where site conditions force a change we raise it and agree it instead of improvising above the ceiling.
Our crews handle chilled water and VRF installation for offices in Dubai, ducted splits and packaged units for villas and retail, kitchen and car park ventilation, and replacement of ageing plant in occupied buildings. Ductwork is fabricated, sealed and insulated to specification; pipework is pressure-tested before it is covered.
Commissioning is where an AC installation proves itself. We balance air and water to the design flow rates, check control sequences and record the results. The service sits within our MEP contracting offering; where a system needs sizing first, our HVAC consultant team does the calculation, and drives and controls are tied in by VFD and BMS contracting. Building owners comparing HVAC contractors in Dubai can ask us for a site visit and an itemised quote.
What's included
Chiller and AHU installation
Rigging, positioning, connection and start-up.
Ductwork and insulation
Fabricated, sealed and insulated to the approved design.
FCU, VRF and split systems
For offices, retail, villas and apartments.
Chilled water pipework
Installed, pressure-tested and insulated.
Testing, balancing and commissioning
Air and water flows set and recorded.
AMC and breakdown support
Scheduled servicing and call-outs after handover.
When to call us
You do not need a finished brief. If any of these sounds familiar, let's talk.
- You have an approved HVAC design and need it installed.
- An existing system cools unevenly or was never balanced.
- Old chillers or package units are due for replacement.
How we work
Survey and scope
We inspect the site and agree scope, programme and responsibilities.
Price and plan
You receive an itemised price and a programme tied to your key dates.
Install
Our teams install, coordinate with other trades and keep the site safe and tidy.
Test and hand over
We test, commission and hand over records, then support inspections and maintenance.
Where we work
- Villas and residential
- Offices and commercial buildings
- Hotels and hospitality
- Healthcare
- Warehouses and industrial units
- Mixed-use developments
Trusted by teams across Dubai and the UAE
What clients say
See our Google reviewsReally good experience with Solve Tech Vision. Their MEP calculation work was accurate, and the team was easy to communicate with.
Professional MEP consultants in Dubai. They understood our requirements quickly and provided clear technical support.
Very professional engineering team. Good communication, practical advice, and smooth service from start to finish.
The team was genuinely helpful and responsive. They handled our engineering requirements professionally and made the whole process easy.
HVAC Contracting: questions, answered
Do you install from another firm's HVAC design?
Yes. If something will not work on site we flag it before installing, not after.
What does testing and commissioning include?
Air balancing to design flow rates, water balancing, control checks and a report your consultant can review.
Can you replace AC plant in an occupied building?
Yes. We phase the work and use temporary cooling where needed so the building stays usable.
Do you maintain systems you did not install?
Yes, after a survey to record the system's condition.
How long does a typical office HVAC installation take?
It depends on scope and access, but a few weeks is typical for a standard office fit-out, run in parallel with the rest of the MEP works.
What is testing and balancing (TAB) in HVAC?
TAB is the measurement and adjustment of air and water flows so every diffuser and coil gets its design quantity. Without it, rooms near the fan get too much air and rooms at the end of the run too little, even when the equipment is the right size. The TAB report is part of the handover file.
Related services

HVAC Consultant
Heat load calculations, duct and pipe sizing and equipment selection.
Read more
MEP Contracting
HVAC, electrical, plumbing and fire fighting installed, tested and commissioned by one team.
Read more
Electrical Contracting
Panels, cabling, lighting and power installed, tested and ready for inspection.
Read more
Ready to talk about your project?
Call +971 524064300, or send us your drawings and we will reply with next steps.

















