MEP Design & Calculations in Al Quoz, Dubai

MEP calculations and drawings for Al Quoz warehouses, workshops, galleries and studios, sized for how each unit is really used.

Call +971 524064300

MEP Design & Calculations work in Al Quoz

Designing MEP for an Al Quoz unit starts with the use: a car workshop needs exhaust extraction and oil interceptors, a food warehouse needs refrigeration power and drainage, and a gallery or studio in a converted warehouse needs quiet, even cooling. Solve Tech Vision calculates loads from the actual equipment and occupancy, then issues the drawings and load schedules needed for approval.

This is our MEP consultancy applied to Al Quoz; once approved, our MEP contractors in Al Quoz can install it.

Dubai buildings work hard: heat, humidity, long operating hours and demanding approvals. Good MEP design decides whether a building is comfortable, whether it's cheap to run and whether a contractor can actually build it. We start with the calculations, not the drawings, because the numbers drive everything else.

What's included

HVAC design and calculations

Load calculations, equipment selection, duct and pipe design.

Electrical design and load schedules

Power, lighting and distribution design with clear schedules.

Plumbing and drainage design

Water supply, drainage and hot water systems.

Coordinated MEP drawings

Services coordinated with each other and with the structure in Revit MEP.

MEP Design & Calculations in Al Quoz: questions, answered

Which authorities approve MEP drawings in Dubai?

That depends on the project. Electrical works go through DEWA, fire and life-safety through Civil Defense and building permits through Dubai Municipality. We confirm the route for your project at the start.

Do you work in BIM?

Yes. We use Revit MEP for coordinated models and produce 2D drawings from the model for approval and construction.

Can you design from architectural concept drawings?

Yes. We can start at concept stage, which is usually the best time, because major decisions about plant space and risers are still open.

Do I need MEP drawings to change the use of an Al Quoz warehouse?

Usually yes. A change of use, for example from storage to a workshop, showroom or studio, changes the fire, ventilation and electrical requirements, and the authorities will want updated MEP drawings and calculations before approving it.

Ready to talk about your project?

Call +971 524064300, or send us your drawings and we will reply with next steps.

Call WhatsApp