MEP Design & Calculations in Business Bay, Dubai

Calculations and MEP drawings for Business Bay fit-outs, prepared for building management NOCs and authority submissions.

Call +971 524064300

MEP Design & Calculations work in Business Bay

For a Business Bay fit-out, the MEP design has to work within what the tower already provides: the chilled water capacity allocated to the unit, spare ways in the floor distribution board and the position of drainage stacks. Solve Tech Vision checks those limits first, then designs the HVAC, electrical and plumbing layouts and prepares the package the building management and authorities review.

See our full MEP consultancy, or hand the approved design to our MEP contractors in Business Bay.

Dubai buildings work hard: heat, humidity, long operating hours and demanding approvals. Good MEP design decides whether a building is comfortable, whether it's cheap to run and whether a contractor can actually build it. We start with the calculations, not the drawings, because the numbers drive everything else.

What's included

HVAC design and calculations

Load calculations, equipment selection, duct and pipe design.

Electrical design and load schedules

Power, lighting and distribution design with clear schedules.

Plumbing and drainage design

Water supply, drainage and hot water systems.

Coordinated MEP drawings

Services coordinated with each other and with the structure in Revit MEP.

MEP Design & Calculations in Business Bay: questions, answered

Which authorities approve MEP drawings in Dubai?

That depends on the project. Electrical works go through DEWA, fire and life-safety through Civil Defense and building permits through Dubai Municipality. We confirm the route for your project at the start.

Do you work in BIM?

Yes. We use Revit MEP for coordinated models and produce 2D drawings from the model for approval and construction.

Can you design from architectural concept drawings?

Yes. We can start at concept stage, which is usually the best time, because major decisions about plant space and risers are still open.

What does building management check in Business Bay MEP drawings?

Mainly that the design stays within the unit's allocated cooling and electrical load, connects to risers and drains at approved points, keeps fire alarm and sprinkler coverage to code and does not affect neighbouring units.

Ready to talk about your project?

Call +971 524064300, or send us your drawings and we will reply with next steps.

Call WhatsApp