
MEP Design & Calculations in Jumeirah Lake Towers (JLT), Dubai
MEP calculations and drawings for Jumeirah Lake Towers offices and shops, prepared for DMCC fit-out approval.
MEP Design & Calculations work in Jumeirah Lake Towers (JLT)
Every fit-out in Jumeirah Lake Towers needs DMCC approval, and the MEP drawings are a large part of that submission: HVAC layouts with load calculations, electrical layouts with the load schedule, plumbing where wet areas are added, and fire alarm and sprinkler layouts. Solve Tech Vision prepares the package, answers reviewer comments and coordinates with the tower's building management.
See our full MEP consultancy, and our MEP contractors in JLT for installation.
Dubai buildings work hard: heat, humidity, long operating hours and demanding approvals. Good MEP design decides whether a building is comfortable, whether it's cheap to run and whether a contractor can actually build it. We start with the calculations, not the drawings, because the numbers drive everything else.
What's included
HVAC design and calculations
Load calculations, equipment selection, duct and pipe design.
Electrical design and load schedules
Power, lighting and distribution design with clear schedules.
Plumbing and drainage design
Water supply, drainage and hot water systems.
Coordinated MEP drawings
Services coordinated with each other and with the structure in Revit MEP.
MEP Design & Calculations in other Dubai areas
MEP Design & Calculations in Business Bay
a dense cluster of commercial and mixed-use towers either side of the Dubai Canal, many wi…
Read moreMEP Design & Calculations in Downtown Dubai
premium towers and mixed-use developments around the Burj Khalifa and Dubai Mall, most und…
Read moreMEP Design & Calculations in Dubai Marina
waterfront residential and hotel towers along the Marina promenade, largely occupied build…
Read moreMEP Design & Calculations in Deira
older commercial buildings, retail units and warehouses across Dubai's original business d…
Read moreMEP Design & Calculations in Jumeirah Lake Towers (JLT): questions, answered
Which authorities approve MEP drawings in Dubai?
That depends on the project. Electrical works go through DEWA, fire and life-safety through Civil Defense and building permits through Dubai Municipality. We confirm the route for your project at the start.
Do you work in BIM?
Yes. We use Revit MEP for coordinated models and produce 2D drawings from the model for approval and construction.
Can you design from architectural concept drawings?
Yes. We can start at concept stage, which is usually the best time, because major decisions about plant space and risers are still open.
What MEP drawings does a DMCC fit-out submission need?
Typically HVAC, electrical, plumbing (if wet areas change), fire alarm and fire fighting layouts, with load calculations and the electrical load schedule. Exact requirements depend on the scope, so we confirm them at the start.
Related services

MEP Contractor
HVAC, electrical and plumbing installed, tested and commissioned by one accountable team.
Read more
Industrial Automation
PLC and SCADA design, installation, commissioning and troubleshooting.
Read more
ELV Systems
CCTV, access control, fire alarm and data cabling designed and installed together.
Read more
Ready to talk about your project?
Call +971 524064300, or send us your drawings and we will reply with next steps.

