MEP Design & Calculations in Jumeirah Lake Towers (JLT), Dubai

MEP calculations and drawings for Jumeirah Lake Towers offices and shops, prepared for DMCC fit-out approval.

Call +971 524064300

MEP Design & Calculations work in Jumeirah Lake Towers (JLT)

Every fit-out in Jumeirah Lake Towers needs DMCC approval, and the MEP drawings are a large part of that submission: HVAC layouts with load calculations, electrical layouts with the load schedule, plumbing where wet areas are added, and fire alarm and sprinkler layouts. Solve Tech Vision prepares the package, answers reviewer comments and coordinates with the tower's building management.

See our full MEP consultancy, and our MEP contractors in JLT for installation.

Dubai buildings work hard: heat, humidity, long operating hours and demanding approvals. Good MEP design decides whether a building is comfortable, whether it's cheap to run and whether a contractor can actually build it. We start with the calculations, not the drawings, because the numbers drive everything else.

What's included

HVAC design and calculations

Load calculations, equipment selection, duct and pipe design.

Electrical design and load schedules

Power, lighting and distribution design with clear schedules.

Plumbing and drainage design

Water supply, drainage and hot water systems.

Coordinated MEP drawings

Services coordinated with each other and with the structure in Revit MEP.

MEP Design & Calculations in Jumeirah Lake Towers (JLT): questions, answered

Which authorities approve MEP drawings in Dubai?

That depends on the project. Electrical works go through DEWA, fire and life-safety through Civil Defense and building permits through Dubai Municipality. We confirm the route for your project at the start.

Do you work in BIM?

Yes. We use Revit MEP for coordinated models and produce 2D drawings from the model for approval and construction.

Can you design from architectural concept drawings?

Yes. We can start at concept stage, which is usually the best time, because major decisions about plant space and risers are still open.

What MEP drawings does a DMCC fit-out submission need?

Typically HVAC, electrical, plumbing (if wet areas change), fire alarm and fire fighting layouts, with load calculations and the electrical load schedule. Exact requirements depend on the scope, so we confirm them at the start.

Ready to talk about your project?

Call +971 524064300, or send us your drawings and we will reply with next steps.

Call WhatsApp