MEP Design & Calculations in Dubai Marina

MEP design for Dubai Marina apartments, hotels and restaurants, from single-unit renovations to whole-floor refurbishments.

Call +971 524064300

MEP Design & Calculations work in Dubai Marina

MEP design in Dubai Marina usually serves a renovation: a merged apartment that needs its fan coil units rebalanced, a hotel refurbishing rooms floor by floor, or a restaurant adding a kitchen to a podium unit. Solve Tech Vision designs within the tower's existing risers and capacities, and prepares the drawings building management and the authorities need before work can start.

See our full MEP consultancy, or the MEP contractors in Dubai Marina who install it.

Dubai buildings work hard: heat, humidity, long operating hours and demanding approvals. Good MEP design decides whether a building is comfortable, whether it's cheap to run and whether a contractor can actually build it. We start with the calculations, not the drawings, because the numbers drive everything else.

What's included

HVAC design and calculations

Load calculations, equipment selection, duct and pipe design.

Electrical design and load schedules

Power, lighting and distribution design with clear schedules.

Plumbing and drainage design

Water supply, drainage and hot water systems.

Coordinated MEP drawings

Services coordinated with each other and with the structure in Revit MEP.

MEP Design & Calculations in Dubai Marina: questions, answered

Which authorities approve MEP drawings in Dubai?

That depends on the project. Electrical works go through DEWA, fire and life-safety through Civil Defense and building permits through Dubai Municipality. We confirm the route for your project at the start.

Do you work in BIM?

Yes. We use Revit MEP for coordinated models and produce 2D drawings from the model for approval and construction.

Can you design from architectural concept drawings?

Yes. We can start at concept stage, which is usually the best time, because major decisions about plant space and risers are still open.

Can two Dubai Marina apartments be merged without redesigning the MEP?

Rarely. Kitchens, bathrooms, fan coil units and distribution boards usually need changing, and fire alarm devices must follow the new layout. A short design package avoids problems at the building approval stage.

Ready to talk about your project?

Call +971 524064300, or send us your drawings and we will reply with next steps.

Call WhatsApp